Yodify Product Library
Add the 2010-2175 Flowline Pilot Valve to your store or catalog  
Book Your Demo and See How
or create your store

2010-2175 Flowline Pilot Valve

Brand: Bifold - by Rotork

These flowline pilot valves are pilot-operated, three port, two position valves with a spring return action. 

The pressure at which the valve functions is variable by adjusting the spring force - a wide range of pressure settings is covered by using seven interchangeable sensing head assemblies.
Features
  • Control Pressure - Standard: Gas 17.3 bar (250 psi)
  • Control Pressure - High: Hydraulic fluid up to 400 bar (6,000 psi) max
  • Process Pressure: 690 bar (10,000 psi) maximum 380 bar (5,510 psi) maximum (2X1X only)
  • Operating Media: Mineral oil, water, water-glycol mixtures, air, natural and sour gases.
  • Connections - Controls: 1/4” NPT.
  • Connection - Process: 1/2” or 3/4” NPT
  • Flow Rate, Nominal: 4.5 litres/min (1.0 imp gall/min)
  • Working Temperature - Standard: –20° to 130°C (-4° to 266°F)
  • Recommended Filtration: 25 micron

Specifications

Approvals & Certifications

  • ATEX
  • CE
  • UKAS

NACE & NIST

  • NACE MR-0175

NPT Connection

  • 1/2" NPT Female
  • 1/4" NPT Female
  • 3/4" NPT Female

Pressure Range

  • bar: 0 to 690
  • kPa: 0 to 69,000
  • psi: 0 to 10,000

Certifications & Approvals

  • CE
  • ATEX

Instantly populate your store or catalog 
CREATE YOUR SITE
or book a demo with the Yodify Team
show more